SPACEONE — COMPUTE INFRASTRUCTURE
0%
Compute infrastructureEST. deployment 01 — YWG-01

Powering serious compute.

Customers bring their own hardware; we build and operate everything between it and the grid. Where power economics make sense — starting in Winnipeg, Canada — with capacity built section by section as demand commits. In an industry defined by hype, we build for discipline.

Manitoba Hydro grid
Cold-climate cooling
BYOH · single rack up
BYOH colocationMetered powerCold-climate economizerRemote handsCustomer-visible telemetryWinnipeg YWG-01
1.0

The advantage

Built where the economics win — and structured so you feel it. Quotes state the delivered price.
0rack minimum
start with a single rack — while most high-density facilities demand multi-rack commitments
100% your hardware
bring your own hardware — your title, your workloads, your software
Hydroelectric grid
Manitoba Hydro — among the lowest-cost industrial power in North America, in a climate that cools
WINNIPEG · MANITOBA · QUOTES STATE THE DELIVERED PRICE
2.0

The platform

2.1
2.1

Power

We site where electricity is genuinely cheap and the climate does part of the cooling. Power is metered and billed transparently — you see the tariff and the margin structure, not a blended mystery number.

2.2

Facility

Rack space engineered in kilowatts, not square feet: clean distribution, per-rack metering, hot/cold-aisle containment, and a cooling path that steps up with density instead of being overbuilt on day one.

2.3

Operations

You own the hardware and choose the workload. We receive, rack, power, connect, monitor, and provide remote hands — the operations layer between your servers and the grid.

2.4

Discipline

Capacity follows demand — a rack is built when a customer commits to it. Nothing on our commitments list is claimed in sales material before it is actually running.

3.0

YWG-01 · Winnipeg

Deployment one of a repeatable, power-location-agnostic playbook. A repurposed industrial building on hydroelectric power, built out in stages.
FACILITY VISUALIZATION — PHOTOGRAPHY IN PRODUCTION
YWG—01
Location
Winnipeg, Manitoba, Canada
49.9°N — prairie cold-climate zone
Power source
Manitoba Hydro — hydroelectric grid
published 2026 tariff
Power
Metered, transparent billing on the hydroelectric grid
you see what you use
Room to grow
Capacity added as customers commit — never speculative
your expansion is already sited
Cooling
Outside-air economizer + containment
mechanical for summer peaks
Status
In build-up — pilot stage
accepting expressions of interest
4.0

The posture

In an industry defined by rapid change, we build for permanence — real numbers, published with their sources; capacity that follows demand; and commitments we only claim after they're running.